IEEE Standards Coordinating Committee 21 (SCC21)

Project Authorization Requests (PARs)

Active PARs

(as of July 2020)

PAR Number Project Type Title PAR Expiration Lead
P1547.2 Revision Application Guide for IEEE Std 1547(TM), IEEE Standard for Interconnecting Distributed Resources with Electric Power Systems 12/31/2021 Stec
P1547.3 Revision Guide for Cybersecurity of Distributed Energy Resources Interconnected with Electric Power Systems 12/31/2023 Sandberg
P1547.9 New Guide to Using IEEE Standard 1547 for Interconnection of Energy Storage Distributed Energy Resources with Electric Power Systems 12/31/2022 Ropp
P2030 Revision Guide for Smart Grid Interoperability of Energy Technology and Information Technology Operation with the Electric Power System (EPS), End-Use Applications, and Loads
12/31/2024 (Under Review)
P2030 .10.1
New Standard for Electricity Access Requirements with Safety Extra Low Voltage (SELV) DC for Tier ll and Tier lll of Energy Sector Management Assistance Program (ESMAP) Multi-tier Framework for Household Electricity Supply
12/31/2023 (Under Review)
P2030 .10.2
New Standard Standard for Electricity Access Requirements for DC low power not exceeding 60V
12/31/2023 (Under Review)

 

 

Draft PARs

(as of August 2018)

PAR Number Project Type Title PAR Expiration Lead / Liaison
P2800 New Standard for Interconnection and Interoperability of Inverter-Based Resources Interconnecting with Associated Transmission Electric Power Systems 10/31/2022 Liaison – Boemer
P2800.1 New Guide for Test and Verification Procedures for Inverter-Based Resources Interconnecting with Associated Transmission Electric Power Systems 10/31/2022 Liaison – Boemer